Stage-1 green needs at least three operator design partners by Q4 2026.
Schema, lifecycle, and exchange evidence start in Phase-0; certification stays explicit.
No production traffic claims until operational certification is earned.
No cross-tenant release unless the differential-privacy debit is written first.
Conformance groundwork
M73-M84 trajectory and exchange lanes
| Lane | Capability | Meaning | Evidence gate |
|---|---|---|---|
M73 | FIXM 4.3 flight object | GUFI-keyed canonical object aligned to FF-ICE R1 lifecycle. | RFC-D10-ATC-IQ-PHASE0 |
M80 | AIXM 5.1.1 / IWXXM v3 bus | AIM/SWIM conformance groundwork for airspace + weather exchange. | AIXM 5.1.1 · IWXXM v3 |
M81 | ASTERIX exchange edge | Surveillance/event conformance boundary defined before live tenant traffic. | CAT021/048/062/065 |
M84 | NM B2B trajectory ops | Eurocontrol flow/slot integration staged behind certified ops onboarding. | NM B2B ops cert |
P20 hard constraint
Differential-privacy release policy
Raw flight objecttenant-only
Never exported cross-tenant; every envelope must carry tenant identity.DP aggregate releaseallowed with debit
Cross-tenant insight only after epsilon consumption is recorded.Lite P20 shortcutrefused
Any analytics surface that leaks competitor intent fails the doctrine check.Execution board